subject
Engineering, 27.11.2019 21:31 guzmangisselle

Write a method splitstack that takes a stack of integers as a parameter and splits it into negatives and non-negatives. the numbers in the stack should be rearranged so that all the negatives appear on the bottom of the stack and all the non-negatives appear on the top. in other words, if after this method is called you were to pop numbers off the stack, you would first get all the nonnegative numbers and then get all the negative numbers. it does not matter what order the numbers appear in as long as all the negatives appear lower in the stack than all the non-negatives. you may use a single queue as auxiliary storage.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
question
Engineering, 04.07.2019 18:10
Ajournal bearing has a journal diameter of 3.250 in with a unilateral tolerance of 20.003 in. the bushing bore has a diameter of 3.256 in and a unilateral tolerance of 0.004 in. the bushing is 2.8 in long and supports a 700-lbf load. the journal speed is 900 rev/min. find the minimum oil film thickness and the maximum film pressure for both sae 20 and sae 20w-30 lubricants, for the tightest assembly if the operating film temperature is 160°f. a computer code is appropriate for solving this problem.
Answers: 3
question
Engineering, 04.07.2019 18:10
Items are similar to the free issue items, but their access is limited. (clo5) a)-bin stock items free issue b)-bin stock controlled issue c)-critical or insurance spares d)-rebuildable spares e)-consumables
Answers: 1
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
You know the right answer?
Write a method splitstack that takes a stack of integers as a parameter and splits it into negatives...
Questions
question
Mathematics, 12.06.2021 02:00
question
Mathematics, 12.06.2021 02:00
question
Mathematics, 12.06.2021 02:00
question
Biology, 12.06.2021 02:00
question
Mathematics, 12.06.2021 02:00
question
Mathematics, 12.06.2021 02:00
Questions on the website: 13722359