subject
Engineering, 26.11.2019 07:31 ovoxotas

Consider a set of mobile computing clients in a certain town who each need to be connected to one of several possible base stations. we’ll suppose there are n clients, with the position of each client specified by its (x, y) coordinates in the plane. there are also k base stations; the position of each of these is specified by (x, y) coordinates as well. for each client, we wish to connect it to exactly one of the base stations. our choice of connections is constrained in the following ways. 1 there is a range parameter r — a client can only be connected to a base station that is within distance r. there is also a load parameter l — no more than l clients can be connected to any single base station. your goal is to design a polynomial-time algorithm for the following problem. given the positions of a set of clients and a set of base stations, as well as the range and load parameters, decide whether every client can be connected simnltaneously to a base station, subject to the range and load conditions in the previous paragraph.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Two flowing streams of argon gas are adiabatically mixed to form a single flow/stream. one stream is 1.5 kg/s at 400 kpa and 200 c while the second stream is 2kg/s at 500 kpa and 100 ? . it is stated that the exit state of the mixed single flow of argon gas is 150 c and 300 kpa. assuming there is no work output or input during the mixing process, does this process violate either the first or the second law or both? explain and state all your assumptions.
Answers: 1
question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:10
Compute the pressure drop of 30°c air flowing with a mean velocity of 8 m/s in a circular sheet-metal duct 300 mm in diameter and 15 m long. use a friction factor, f 0.02, and pair = 1.1644 kg/m a. 37.26 pa b. 25.27 pa n c. 29.34 pa d. 30.52 pa
Answers: 1
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
You know the right answer?
Consider a set of mobile computing clients in a certain town who each need to be connected to one of...
Questions
question
Mathematics, 16.12.2020 05:30
question
Physics, 16.12.2020 05:30
question
Mathematics, 16.12.2020 05:30
Questions on the website: 13722367