Using only the clt and the numbers of yes and no voters in our sample of 400,compute (algebraically) a numberapproximate_sdthat’s the predicted standard deviation of thearrayresample_yes_proportionsacc ording to the central limit theorem. do not access thedata inresample_yes_proportionsin any way. remember that a predicted standard deviationof the sample means can be computed from the population sd and the size of the sample

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
question
Engineering, 04.07.2019 18:10
Hydraulic fluid with a sg. of 0.78 is flowing through a 1.5 in. i.d. pipe at 58 gal/min. the fluid has an absolute viscosity of 11.8 x 105 lbf-sec/ft2. is the flow laminar, turbulent or within the critical range? give both a numerical reynolds number and a term answer.
Answers: 3
question
Engineering, 04.07.2019 18:20
Air is compressed isentropically from an initial state of 300 k and 101 kpa to a final temperature of 1000 k. determine the final pressure using the following approaches: (a) approximate analysis (using properties at the average temperature) (b) exact analysis
Answers: 1
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
Using only the clt and the numbers of yes and no voters in our sample of 400,compute (algebraically)...
Questions
question
Mathematics, 11.03.2021 07:10
question
Mathematics, 11.03.2021 07:10
question
Mathematics, 11.03.2021 07:10
Questions on the website: 13722360