On average 16 new batches of parts are started through a certain plant each week. average batch quantity is 50 parts that are processed through a sequence of seven machines. setup time per machine per batch averages 4 hours, and average operation time per machine for each part is 12 min. nonoperation time per batch at each machine averages 8 hours. there are 37 machines in the factory. any machine can be set up for any type of batch processed in the plant. the plant operates 40 hours per week. the plant manager complains that almost 65 hours of overtime must be authorized each week to keep up with the production schedule. determine
(a) manufacturing lead time for an average order,
(b) weekly production capacity of the plant if all machines were operated at 100% utilization,
(c) current utilization of the plant, and
(d) average work-in-process (number of parts) in the plant.
(e) why must overtime be authorized to achieve the desired output?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 03.07.2019 15:10
If you were designing a bumper for a car, would you prefer it to exhibit elastic or plastic deformation? why? consider the functions of a bumper in both a minor "fender-bender" and a major collision.
Answers: 1
question
Engineering, 04.07.2019 18:20
What is the heat treatment of metals? what is the benefit of it? why and how it's useful? answer in details, do not write by hand.
Answers: 3
question
Engineering, 04.07.2019 18:20
Wiy doeres rere okhn a pump whon working betwon the same pressure range?
Answers: 2
You know the right answer?
On average 16 new batches of parts are started through a certain plant each week. average batch quan...
Questions
question
Mathematics, 28.04.2021 23:40
question
Mathematics, 28.04.2021 23:40
Questions on the website: 13722361