subject
Engineering, 22.11.2019 06:31 muncyemily

3. the design criteria for oxidation ponds (also called facultative ponds, aerated facultative ponds) specified that (1) bod loading into the primary cell (or pond) shall not exceed 25 lbs bod/acre/day, (2) the minimum total water retention time, based on influent flow and all cells at water depth of 5 ft should not be less than 120 days., (3) the volume of winter storage between the water depths of 1.5 and 5 ft shall be sufficient so that no discharge is necessary for a four-month period, and (4) pond system should have at least two primary cells and one or more secondary cells. size the ponds for a community that generates 160,000 gpd wastewater with a bod of 220 mg/l. based on the climate of the area, the net water loss (evaporation plus seepage minus precipitation) during the storage months is 1.0 inch/month.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 18:10
Give heat transfer applications for the following, (i) gas turbines (propulsion) ) gas turbines (power generation). (iii) steam turbines. (iv) combined heat and power (chp). (v) automotive engines
Answers: 1
question
Engineering, 04.07.2019 18:10
Carbon dioxide gas expands isotherm a turbine from 1 mpa, 500 k at 200 kpa. assuming the ideal gas model and neglecting the kinetic and potential energies, determine the change in entropy, heat transfer and work for each kilogram of co2.
Answers: 2
question
Engineering, 04.07.2019 18:20
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
You know the right answer?
3. the design criteria for oxidation ponds (also called facultative ponds, aerated facultative ponds...
Questions
question
Mathematics, 07.07.2021 02:50
Questions on the website: 13722360