Amunicipal wastewater treatment plant employs two circular primary clarifiers arranged in parallel, following the bar screen and grit removal chamber. the plant receives 5.0 mgd. each clarifier is center-fed (water enters at the center and exits at the perimeter). the clarifier radius is 43.0 ft, and depth is 10.0 ft.

(a) what is the detention time in each clarifier?
(b) what is the hydraulic loading rate (critical velocity) in units of ft 3 βˆ™ ft -2 βˆ™ hr -1 ?
(c) what is the weir loading rate in units of ft 3 βˆ™ ft -1 βˆ™ hr

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
You know the right answer?
Amunicipal wastewater treatment plant employs two circular primary clarifiers arranged in parallel,...
Questions
question
Chemistry, 20.10.2021 08:30
question
Arts, 20.10.2021 08:30
question
Mathematics, 20.10.2021 08:30
question
History, 20.10.2021 08:30
question
Social Studies, 20.10.2021 08:30
Questions on the website: 13722362