Engineering, 13.11.2019 18:31 hei40563273

Using the following details you conduct pert analysis. the analysis is broken in smaller sub questions. so answering them one by one will complete the analysis. optimistic most likelypessimistic expected variance act no. description time time time time start activity a acti activity c activ 12 10 21 10 17 finish all times as in weeks answer the following questions: calculate the expected time of all the activities including start and finish. calculate variation of all the activities including start and finish. identify the four paths for the network and using your answer 1 and 2 values calculate the expected duration and variance of each path respectively identify the critical path. using the expected duration and variation of only the critical path calculate the probabilities of completing the project in 40 weeks, 42.5 weeks and 48 weeks. 1. 2. 3. 4. 5.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
question
Engineering, 04.07.2019 18:10
Awall of 0.5m thickness is to be constructed from a material which has average thermal conductivity of 1.4 w/mk. the wall is to be insulated with a material having an average thermal conductivity of 0.35 w/mk so that heat loss per square meter shall not exceed 1450 w. assume inner wall surface temperature of 1200Β°c and outer surface temperature of the insulation to be 15Β°c. calculate the thickness of insulation required.
Answers: 3
question
Engineering, 04.07.2019 18:20
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?
Answers: 3
question
Engineering, 04.07.2019 19:10
When subject to a steady load (within elastic range) over a long period of time, what is the major difference in material behavoir between steel and plastic?
Answers: 2
You know the right answer?
Using the following details you conduct pert analysis. the analysis is broken in smaller sub questi...
Questions
question
Arts, 18.11.2020 02:40
Questions on the website: 13722363