subject
Engineering, 13.11.2019 17:31 anders00

Leighton industries needed steel pipe to build furnaces for a customer. leighton sent callier steel an order for a certain quantity of "a 106 grade b" steel. callier confirmed the order and created a contract by sending an invoice to leighton, stating that it would send "a 106 grade b" steel, as ordered. callier delivered the steel, and leighton built the furnaces, but they leaked badly and required rebuilding. tests demonstrated that the steel was not in fact "a 106 grade b," but an inferior steel. leighton sued. who wins?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:10
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
question
Engineering, 07.07.2019 03:10
Which engine component must be able to withstand the extreme heat produced by the burning air-and-fuel mixture as well as the physical forces produced during the power stage?
Answers: 1
You know the right answer?
Leighton industries needed steel pipe to build furnaces for a customer. leighton sent callier steel...
Questions
question
Mathematics, 13.07.2019 03:30
question
Advanced Placement (AP), 13.07.2019 03:30
question
Mathematics, 13.07.2019 03:30
Questions on the website: 13722367