subject
Engineering, 12.11.2019 22:31 rolo7105

Write a method stutter that takes an arraylist of strings and an integer k as parameters and that replaces every string with k copies of that string. for example, if the list stores the values ["how", "are", "you? "] before the method is called and k is 4, it should store the values ["how", "how", "how", "how", "are", "are", "are", "are", "you? ", "you? ", "you? ", "you? "] after the method finishes executing. if k is 0 or negative, the list should be empty after the call.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Apiston-cylinder with a volume of 0.25 m3 holds 1 kg of air (r 0.287 k/kgk) at a temperature of 100 c. heat transfer to the cylinder causes an isothermal expansion of the piston until the volume triples. how much heat is added to the piston-cylinder?
Answers: 3
question
Engineering, 04.07.2019 18:10
Consider a large isothermal enclosure that is maintained at a uniform temperature of 2000 k. calculate the emissive power of the radiation that emerges from a small aperture on the enclosure surface. what is the wavelength ? , below which 10% of the emission is concentrated? what is the wavelength ? 2 above which 10% of the emission is concentrated? determine the wavelength at which maximum spectral emissive power occurs. what is the irradiation incident on a small object placed inside the enclosure?
Answers: 2
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
question
Engineering, 06.07.2019 03:10
Different between right hand turning tool and left hand turning tool ?
Answers: 1
You know the right answer?
Write a method stutter that takes an arraylist of strings and an integer k as parameters and that re...
Questions
question
English, 30.03.2021 01:30
question
English, 30.03.2021 01:30
question
Mathematics, 30.03.2021 01:30
question
Mathematics, 30.03.2021 01:30
question
English, 30.03.2021 01:30
question
Mathematics, 30.03.2021 01:30
Questions on the website: 13722362