In a bid package given to a flooring sub, the gc accidently forgot to include a floor plan representing a few rooms totaling 2,500sf. the entire building is 550,000sf. the flooring subcontractor bid the project using the floorplans provided (missing 2,500sf) and signed a contract with the information received. if the scope of the contract states, "provide all flooring in new facility," is this contract enforceable by law? why or why not? 1.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:20
For a gate width of 2 m into the paper, determine the force required to hold the gate abc at its location.
Answers: 1
question
Engineering, 04.07.2019 19:20
A21-tooth spur pinion mates with a 28-tooth gear. the diametral pitch is 3 teeth/in and the pressure angle is 20°, find the following values: the addendum, dedendum, circular pitch, tooth thickness, and base circle diameters.
Answers: 2
question
Engineering, 05.07.2019 10:10
What is the correct way to measure the overall length of a boat? measure from the tip of the bow to the highest point on the gunwale. measure from the tip of the bow in a straight line to the stern of the boat. measure from the tip of the bow in a straight line to the back seat. measure from port to starboard at the boat's widest point.
Answers: 1
question
Engineering, 06.07.2019 03:20
Write a technical essay (maximum two pages) about stress concentration. and paste from the textbook. instead, read updated material about this phenomenon and provide a technical evaluation of the different techniques to avoid/reduce such phenomenon. consider in your analysis cutting-edge computational techniques such as fea to study and analyze stress concentrations.
Answers: 2
You know the right answer?
In a bid package given to a flooring sub, the gc accidently forgot to include a floor plan represent...
Questions
Questions on the website: 13722367