It rains during the construction of a building and water fills a recently excavated pit to a depth, h=0.5m. in order to continue construction, the water must first be pumped out of the pit. a hose with a length of l=50m, a diameter of d=2.5*10-2 m, and a surface roughness of e=5.0*10-5 m is attached to a pump. note that the kinematic viscosity of the water is n=1.005*10-6 m2 /s and the density is r=1000 kg/m3 .

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
Courses that are developed by subject matter experts, internal or extemal to the college or university. these programs are marketed by the school (clo2) marks a)-vocational schools b)-vendor training c)-colleges & universities d)-continuing education programs
Answers: 2
question
Engineering, 04.07.2019 18:20
Agas mixture consists of 8 kmol of h2 and 2 kmol of n2. determine the mass of each gas and the apparent gas constant of the mixture.
Answers: 3
question
Engineering, 04.07.2019 18:20
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2
You know the right answer?
It rains during the construction of a building and water fills a recently excavated pit to a depth,...
Questions
question
Mathematics, 04.02.2020 16:43
question
Mathematics, 04.02.2020 16:43
Questions on the website: 13722367