subject
Engineering, 09.11.2019 03:31 babyduckies37

Assume you have the following jobs to execute with one processor: give the average wait time for this set of processes using the following algorithms. specify the arbitration rule used for each algorithm, if needed. (a) first in first out (b) shortest job next (non-preemptive) (c) shortest remaining time next (pre-emptive) (d) round robin, with a quantum of 7 (e) round robin, with a quantum of 5 plus context switch time of 1

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
question
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
You know the right answer?
Assume you have the following jobs to execute with one processor: give the average wait time for th...
Questions
question
History, 04.02.2020 11:47
question
Biology, 04.02.2020 11:47
question
Social Studies, 04.02.2020 11:47
question
Mathematics, 04.02.2020 11:47
Questions on the website: 13722361