subject
Engineering, 09.11.2019 02:31 michael1498

2. (5 pts) a landscaper subcontractor signed a subcontract with a gc for a specific scope and price. the scope did not include watering the new grass seed to get it established, which involves temporary irrigation lines and sprinkler heads. the project was going well and towards the end the landscaper sent an email to the gc saying, "i’ve decided to water the grass for you." the sub later decided to buy his entire team 80’s retro ski jackets instead of watering the grass. was this a valid, legally enforceable contract to water the grass? why or why not?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Amass of 1.5 kg of air at 120 kpa and 24°c is contained in a gas-tight, frictionless piston-cylinder device. the air is now compressed to a final pressure of 720 kpa. during the process, heat is transferred from the air such that the temperature inside the cylinder remains constant. calculate the boundary work input during this process.
Answers: 2
question
Engineering, 04.07.2019 18:10
Fluids at rest possess no flow energy. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 19:10
A)-explain briefly the importance of standards in engineering design. b)- what is patent? c)-explain the relationship between these standards: b.s. and b.s.en d)- in engineering design concepts, types of loads and how they act are important factors. explain.
Answers: 3
You know the right answer?
2. (5 pts) a landscaper subcontractor signed a subcontract with a gc for a specific scope and price....
Questions
question
Mathematics, 17.03.2020 00:03
Questions on the website: 13722367