subject
Engineering, 08.11.2019 23:31 oscarmasinde44

Ascraper is operating on an earthen road and has penetration of 2 in. this scraper has an evw of 90,000 lb and its gvw is 170,000 lb. the grade from cut to fill is 2.5%. a) calculate the total resistance in both pounds and equivalent grade b) using the performance chart given on slide 32 (numerical example 1 equipment power) determine the speed

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
question
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
You know the right answer?
Ascraper is operating on an earthen road and has penetration of 2 in. this scraper has an evw of 90,...
Questions
question
English, 14.04.2020 20:47
question
Business, 14.04.2020 20:47
question
English, 14.04.2020 20:47
question
Mathematics, 14.04.2020 20:47
Questions on the website: 13722367