subject
Engineering, 08.11.2019 05:31 shadowsnake

Anorthbound two-lane (one direction) segment of freeway currently has a measured density of 32.0 pc/mi/ln and a measured free-flow speed of 65 mi/hr. the peak-hour factor is 0.95, the traffic stream contains 7% single-unit trucks and 3% tractor-trailer trucks. the freeway segment is a on 3.5% upgrade that is ¾ of a mile long. with the peak hour factor unchanged, how many trucks (assuming the same st/tt split and et_new = 2.35) can be added to the peak hour factor before capacity is reached?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Awall of 0.5m thickness is to be constructed from a material which has average thermal conductivity of 1.4 w/mk. the wall is to be insulated with a material having an average thermal conductivity of 0.35 w/mk so that heat loss per square meter shall not exceed 1450 w. assume inner wall surface temperature of 1200°c and outer surface temperature of the insulation to be 15°c. calculate the thickness of insulation required.
Answers: 3
question
Engineering, 04.07.2019 18:20
Asolid cylinder is concentric with a straight pipe. the cylinder is 0.5 m long and has an outside diameter of 8 cm. the pipe has an inside diameter of 8.5 cm. the annulus between the cylinder ad the pipe contains stationary oil. the oil has a specific gravity of 0.92 and a kinematic viscosity of 5.57 x 10-4 m2/s. most nearly, what is the force needed to move the cylinder along the pipe at a constant velocity of 1 m/s?
Answers: 3
question
Engineering, 04.07.2019 19:20
To save energy, the air supply to a 2000 ft office has been shut off overnight and the room temperature has dropped to 40°f. in the morning, the thermostat is reset to 70°f and warm air at 120 f begins to flov in at 200ft'/min. the air is well mixed within the room, and an equal mass flow of air at room temperature (changing with time) is withdrawn through a return duct. the air pressure is nearly 1 atm everywhere. ignoring heat transfer with the surroundings and kinetic and potential energy effects, estimate how long it takes for the room temperature to reach 70°f. plot the room temperature as a function of time.
Answers: 1
question
Engineering, 06.07.2019 02:30
Around steel bar, made from material with a yield stress of 750mpa, is loaded so that it has stresses co locations of maximum normal stress and maximum shear stress. use maximum shear stress and maximum distortion energy theories to calculate the safety factors for initial yielding failures.
Answers: 3
You know the right answer?
Anorthbound two-lane (one direction) segment of freeway currently has a measured density of 32.0 pc/...
Questions
question
Mathematics, 19.11.2020 02:10
question
Mathematics, 19.11.2020 02:10
question
Mathematics, 19.11.2020 02:10
question
Mathematics, 19.11.2020 02:10
question
Mathematics, 19.11.2020 02:10
Questions on the website: 13722362