subject
Engineering, 05.11.2019 06:31 crybaby222psyc

You are in charge of ordering the concrete for a basement wall concrete pour. the wall forms are all set up and ready. the wall around the basement is 10 inches thick. the interior finished dimension of the basement is 120 feet 5 inches by 86 feet 4-1/2 inches and fourteen (14') feet tall. what is the exact quantity of concrete in cubic yards (cy) to order plus three (3%) per cent added for spilled concrete.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
question
Engineering, 04.07.2019 18:10
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
question
Engineering, 04.07.2019 19:10
The proportional limit is always greater than the yield strength for a material. a)-trune b)- false
Answers: 3
question
Engineering, 04.07.2019 19:10
A)-in the process of engineering design, explain the contribution of material selection. b)- explain the procedure of synthesis as is employed in engineering design. c)- is there any relationship between ergonomics and engineering design? explain. d)- safety consideration in engineering design includes human, product and the enviroment . explain how safety will be incorporated into the design?
Answers: 3
You know the right answer?
You are in charge of ordering the concrete for a basement wall concrete pour. the wall forms are all...
Questions
question
Mathematics, 03.02.2020 14:57
question
Mathematics, 03.02.2020 14:57
question
Computers and Technology, 03.02.2020 14:57
question
Mathematics, 03.02.2020 14:57
question
Geography, 03.02.2020 14:57
Questions on the website: 13722367