subject
Engineering, 29.10.2019 09:31 sarahsteelman

problem 1: schedule based on lot for lot and give the costs.
hedule
- in wet
2 weei
lead time =
setup cost =
holding cost=
stockout cost=
2 weeks
300 $
15 $ per week per unit
30 $/week
setup cost=
holding cost
stockout cost =
total=
1
10
16
2
15
7
3
20
4
25
5
10
6
200
8
25
9
15
period:
gross requirement
on hand begin of period
on hand end of period
net requirement
planned order receipt
planned order release
stockout

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
question
Engineering, 04.07.2019 18:10
Atmospheric air has a temperature (dry bulb) of 80° f and a wet bulb temperature of 60° f when the barometric pressure is 14.696 psia. determine the specific humidity, grains/lb dry air. a. 11.4 c. 55.8 d. 22.5 b. 44.1
Answers: 1
You know the right answer?
problem 1: schedule based on lot for lot and give the costs.
hedule
- in wet
2 we...
Questions
Questions on the website: 13722367