subject
Engineering, 29.10.2019 02:31 jmeza502506

Compute the average hourly cost of a carpenter to a contractor. assume the work is in a subsistence area and the daily subsistence rate is $19.50. the carpenter works the second shift on a two-shift project where a project labor contract establishes a "work 7 pay 8 hour" pay basis for straight time. he works 6 days, 10 hours a day. in addition to time and a half for overtime monday through friday, the contract calls for double time for all work on weekends

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Wiy doeres rere okhn a pump whon working betwon the same pressure range?
Answers: 2
question
Engineering, 04.07.2019 19:10
Asteel wire of 2 mm diameter is fixed between two points located 2 m apart. the tensile force in the wire is 250n, if its density of steel is given by 7830 kg/m3 the fundamental frequency of vibration hz? ?
Answers: 3
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
question
Engineering, 06.07.2019 03:10
What is the direction and how to operate the lathe?
Answers: 2
You know the right answer?
Compute the average hourly cost of a carpenter to a contractor. assume the work is in a subsistence...