subject
Engineering, 23.10.2019 22:00 cocothunder635

(10 points) a highway reconstruction project is being undertaken to reduce crach rates. the reconstruction involves a major realignment of the highway such that a 60 mph design speed is attained. at one point on the highway, a 720-ft equal tangent crest vertical curve exists. measurements show that at 3+40 stations from pvc, the vertical curve offset is 3.5 ft. assess the adequacy of this existing curve in light of the reconstruction design speed of 60 mph and if the existing curve is inadequate, compute a satisfactory curve length.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Water at 70°f and streams enter the mixing chamber at the same mass flow rate, determine the temperature and the quality of the exiting stream. 0 psia is heated in a chamber by mixing it with saturated water vapor at 20 psia. if both streams enters the mixing chamber at the same mass flow rate, determine the temperature and the quality of the existing system.
Answers: 2
question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 19:10
In general, how do thermosetting plastics compare to thermoplastics in mechanical and physical properties?
Answers: 3
You know the right answer?
(10 points) a highway reconstruction project is being undertaken to reduce crach rates. the reconstr...
Questions
question
History, 20.09.2020 09:01
question
English, 20.09.2020 09:01
Questions on the website: 13722363