subject
Engineering, 22.10.2019 20:00 sebascarvallo2003

Six flags great america is constructing a new roller coaster. the project is scheduled to begin in the winter and they hope to have it ready for their busy summer season. the roller coaster planner has identified the following activities and their estimated times. immediate activity predecessor weeks a — 3 b — 1 c — 2 d a, b, c 4 e d 5 f a 3 g d, f 6 h e 4 (a) draw the project network and compute the earliest start, latest start, earliest finish, and latest finish time for each activity. (b) how long will it take to complete the roller coaster? (c) what is the critical path? (d) compute the slack for each of the non-critical activities. (e) if the planner were to add extra resources to activity f so that it takes 2 weeks instead of 3 weeks, how long would it take to complete the roller coaster? homework 8 ©2015 david czerwinski 3 bus 190 (f) if the planner were to add extra resources to activity d so that it takes 3 weeks instead of 4 weeks, how long would it take to complete the roller coaster? (g) a component needed to complete activity g has been damaged and a replacement has been ordered. because of this, activity g will take four weeks longer than orig

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
question
Engineering, 04.07.2019 18:10
Aflywheel accelerates for 5 seconds at 2 rad/s2 from a speed of 20 rpm. determine the total number of revolutions of the flywheel during the period of its acceleration. a.5.65 b.8.43 c. 723 d.6.86
Answers: 2
question
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
question
Engineering, 06.07.2019 04:10
Steam enters a converging nozzle at 3.0 mpa and 500°c with a negligible velocity, and it exits at 1.8 mpa. for a nozzle exit area of 32 cm2, determine the exit velocity, mass flow rate, and exit mach number if the nozzle: is isentropic (a) (b) has an efficiency of 94 percent
Answers: 1
You know the right answer?
Six flags great america is constructing a new roller coaster. the project is scheduled to begin in t...
Questions
Questions on the website: 13722363