subject
Engineering, 09.10.2019 19:30 tommy4260

At a construction site, there are constant arguments and conflicts amongst workers of different contractors and sub-contractors. the construction manager is unable to bring the situation under control. as a result, thereā€™s a delay in project completion. which skill is the construction manager lacking in? a. communication b. technical c. planning d. interpersonal e. it

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afour cylinder four-stroke in-line engine has a stroke of 160mm, connecting rod length of 150mm, a reciprocating mass of 3kg and its firing order is 1-3-4-2. the spacing between cylinders is 100mm. i. show that the engine is in balance with regard to the primary inertia forces and primary 3. a and secondary inertia couples. li determine the out of balance secondary inertia force ii. propose ways of balancing this out of balance force and discuss the challenges that will arise
Answers: 3
question
Engineering, 04.07.2019 18:10
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:20
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2
question
Engineering, 04.07.2019 19:10
The sum of the normal stresses does not change as the stress state rotates through an angle. a)-trune b)- false
Answers: 2
You know the right answer?
At a construction site, there are constant arguments and conflicts amongst workers of different cont...
Questions
question
Mathematics, 04.12.2020 20:00
question
Mathematics, 04.12.2020 20:00
question
Mathematics, 04.12.2020 20:00
Questions on the website: 13722363