Engineering, 09.10.2019 19:30 Kinglilray998
As a construction manager, alex found a major issue with the client’s design demands. he found out that the building design was not feasible considering the quality of the soil of the area, and technology constraints. so, alex convinced the client to discard the original building design and choose a more economical building design that was environment-friendly. which human resource skill alex convince the client? a. supportiveness b. negotiation c. coordination d. planning skill e. analytical skill
Answers: 3
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
Engineering, 03.07.2019 14:10
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
As a construction manager, alex found a major issue with the client’s design demands. he found out t...
Mathematics, 12.04.2021 16:10
Mathematics, 12.04.2021 16:10
History, 12.04.2021 16:10
Chemistry, 12.04.2021 16:10
Mathematics, 12.04.2021 16:10
Mathematics, 12.04.2021 16:10
Biology, 12.04.2021 16:10
Mathematics, 12.04.2021 16:10
History, 12.04.2021 16:10
Mathematics, 12.04.2021 16:10
Mathematics, 12.04.2021 16:10
World Languages, 12.04.2021 16:10