subject
Engineering, 08.10.2019 06:00 jasiyous21

You are designing a pmd and optimizing it for low energy. the core, including an 8 kb l1 data cache, consumes 1 w whenever it is not in hibernation. if the core has a perfect l1 cache hit rate, it achieves an average cpi of 1 for a given task, that is, 1000 cycles to execute 1000 instructions. each additional cycle accessing the l2 and beyond adds a stall cycle for the core. based on the following specifications, what is the size of l2 cache that achieves the lowest energy for the pmd (core, l1, l2, memory) for that given task?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:20
An engine runs on the ideal diesel cycle. the cycle has a compression ratio of 20 and a cutoff ratio of 2. the highest temperature in the cycle is 1200 k. if the heat into the system is 300 kj/kg of working fluid and using variable specific heats determine the work produced per mass of working fluid
Answers: 3
question
Engineering, 04.07.2019 19:20
The power source in a certain welding setup generates 3500w that is transferred to the low carbon steel work with a heat transfer factor of 0.85. the melting factor in the operation is 0.45. a continuous fillet weld is to be made with a cross-sectional area of 23 mm2 determine the travel speed at which the welding can be accomplished.
Answers: 3
question
Engineering, 04.07.2019 19:20
Asimple speed reducer is composed of 2 spur gears. the pinion gear has a pitch diameter of 0.75" and 36 teeth while the driven gear has a pitch diameter of 4.0" and 192 teeth. a)-what is the diametral pitch of each gear? b)-if an electric motor rotating ccw at 3000 rpm is coupled to the pinion, what is the rotational speed of the driven gear? c)-if the torque delivered to the pinion is 1 n-m, what is the torque on the driven gear? d)-what is the power transmitted by the gear train?
Answers: 1
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
You are designing a pmd and optimizing it for low energy. the core, including an 8 kb l1 data cache,...
Questions
question
Social Studies, 26.06.2019 10:00
Questions on the website: 13722363