subject
Engineering, 07.10.2019 21:00 22savage2017

Discuss what you need to do if, in conducting your fmea analysis, you discover a failure mode, effect, or cause that you feel needs to be included in your analysis, but can’t be mapped into the other models according to these rules. describe how other process models you’ve developed have to be changed to bring your new fmea entries into proper alignment. how might this affect your project scope and schedule?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 18:20
Avolume of 2.65 m3 of air in a rigid, insulated container fitted with a paddle wheel is initially at 264 k, 5.6 bar. the air receives 432 kj by work from the paddle wheel. assuming the ideal gas model with cv = 0.71 kj/kg • k, determine for the air the amount of entropy produced, in kj/k
Answers: 2
question
Engineering, 06.07.2019 02:30
A75mm diameter shaft is supported in a journal bearing 75mm long with a diametral clearance of 0. 1mm. it supports a radial load of 1000 n and is lubricated with sae 50 oil at 70°c. find the friction torque and the power loss when the crankshaft rotates at 2900 rev/min.
Answers: 1
question
Engineering, 06.07.2019 02:30
Precipitation hardening can be achieved in many light alloys by a three-step heat treatment. what is carried out and what is the purpose at each step? why is such a treatment necessary based on the nucleation and growth theory of phase transformation. compare this treatment with tempering martensite for carbon steels (similarities and differences).
Answers: 1
You know the right answer?
Discuss what you need to do if, in conducting your fmea analysis, you discover a failure mode, effec...
Questions
question
English, 22.04.2021 01:00
question
Mathematics, 22.04.2021 01:00
Questions on the website: 13722362