subject
Engineering, 05.10.2019 14:30 bjdlesain

Suppose an assembly requires five components from five different vendors. to guarantee starting the assembly on time with 90 percent confidence, what must the service level be for each of the five components? (assume the same service level for each component).

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 08:10
Which of the following is an easy way to remember the modified “x” tire rotation? a. nondrive wheels straight, cross the drive wheels b. drive wheels straight, cross the nondrive wheels c. drive wheels crossed, nondrive wheels straight d. drive wheels crossed, nondrive wheels crossed
Answers: 1
question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:20
Derive the correction factor formula for conical nozzle i=-(1+ cosa) and calculate the nozzle angle correction factor for a nozzle whose divergence hal-fangle is 13 (hint: assume that all the mass flow originates at the apex of the cone.
Answers: 3
You know the right answer?
Suppose an assembly requires five components from five different vendors. to guarantee starting the...
Questions
question
Chemistry, 24.02.2021 01:20
question
Mathematics, 24.02.2021 01:20
question
Mathematics, 24.02.2021 01:20
question
English, 24.02.2021 01:20
question
Mathematics, 24.02.2021 01:20
Questions on the website: 13722363