Engineering, 02.10.2019 00:30 krog79
3) a scraper with a 275 hp. diesel engine will be used to excavate and haul earth for a highway project. an evaluation of the job-site conditions indicates the scraper will operate 40 min./hr. for this project it is anticipated that the total cycle time will be 20 min. for a round trip. previous job records show the scraper operated at full power for the 1.5 min. required to fill the bowl of the scraper and at 80% of the rated hp. for the balance of the cycle time. calculate the gallons per hour for fuel consumption of the scraper.
Answers: 1
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
Engineering, 04.07.2019 18:10
Which of the following ziegler nichols tuning methods the response of the controller to a step input should exhibit an s-shaped curve? a)-open loop mode b)-closed loop mode c)-both modes (open & closed) d)-none of the modes (open & closed)
Answers: 3
Engineering, 04.07.2019 19:10
What are the major differences between injection molding and extrusion?
Answers: 2
3) a scraper with a 275 hp. diesel engine will be used to excavate and haul earth for a highway proj...
Health, 28.02.2020 04:34
Physics, 28.02.2020 04:34
English, 28.02.2020 04:34
History, 28.02.2020 04:35
Mathematics, 28.02.2020 04:35
Advanced Placement (AP), 28.02.2020 04:35
Mathematics, 28.02.2020 04:35
History, 28.02.2020 04:35
Spanish, 28.02.2020 04:35