subject
Engineering, 28.09.2019 01:10 trinityhayes347

Arefrigeration system to be installed must be capable of cooling 10,000 lbm of pork shoulder from 40 °f to 10 °f in 2 hours. the pork shoulder has a freezing point of 28 °f, water content of 73%, a specific heat above freezing of 0.86 btu/lbm-°f and below freezing of 0.53 btu/lbm-°f, and a thermal conductivity of 0.71 btu/hr-ft-°f. assuming atmospheric conditions, what is the required capacity of refrigeration system? use the latent heat of fusion for water (at 1atm), hf= 144 btu/lbm.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
question
Engineering, 04.07.2019 19:10
The proportional limit is always greater than the yield strength for a material. a)-trune b)- false
Answers: 3
You know the right answer?
Arefrigeration system to be installed must be capable of cooling 10,000 lbm of pork shoulder from 40...
Questions
question
Mathematics, 21.08.2019 07:30
question
Chemistry, 21.08.2019 07:30
question
Social Studies, 21.08.2019 07:30
question
Mathematics, 21.08.2019 07:30
question
Mathematics, 21.08.2019 07:30
Questions on the website: 13722363