Your engineering firm has been hired by the local electric company to construct them a wind farm on a square plot of 8567 hectares of land. the rotational diameter of the turbine blades is 50 meters. the distance between turbines from rotational diameter to rotational diameter in the same row must be 2500 feet and the distance between turbine rows must be 4000 feet in order for the turbines to operate at maximum efficiency. how many turbines will be in each row and how many rows of turbines will there be in total? remember, you can’t have a fraction of a turbine.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
question
Engineering, 04.07.2019 18:20
What is the heat treatment of metals? what is the benefit of it? why and how it's useful? answer in details, do not write by hand.
Answers: 3
question
Engineering, 04.07.2019 18:20
An engine runs on the ideal diesel cycle. the cycle has a compression ratio of 20 and a cutoff ratio of 2. the highest temperature in the cycle is 1200 k. if the heat into the system is 300 kj/kg of working fluid and using variable specific heats determine the work produced per mass of working fluid
Answers: 3
You know the right answer?
Your engineering firm has been hired by the local electric company to construct them a wind farm on...
Questions
question
Biology, 05.11.2020 18:40
question
English, 05.11.2020 18:40
question
English, 05.11.2020 18:40
Questions on the website: 13722367