subject
Engineering, 18.09.2019 00:10 nananananananan03

Th e results of the spec cpu2006 bzip2 benchmark running on an amd barcelona has an instruction count of 2.389e12, an execution time of 750 s, and a reference time of 9650 s. find the cpi if the clock cycle time is 0.333 ns.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
question
Engineering, 04.07.2019 18:20
Amixture of slurry and mud is to be pumped through a horizontal pipe of diameter 500 mm. the fluid behaves as a bingham plastic with a yield stress of 30 pa and viscosity 0.04 pa.s. describe the effects of the shear stress through a transverse section of the pipe by plotting the variation in shear stress and velocity profile: (i) just before the slurry starts to move (ii) as the slurry flows when the pressure gradient is double that in part (i)
Answers: 3
question
Engineering, 04.07.2019 19:20
Determine the time of the day and month of the year at which the peak sensible cooling load occurs for a top floor, north-eastern corner room of an office building in durban for the following conditions: floor area: 8 x 8 x 3 m east and north walls: 115 mm face brick (outside), 20 mm air space, 115 mm ordinary brick (inside) with 15 mm plaster roof construction: suspended plasterboard ceiling, 450 mm air space, 150 mm concrete, 75mm screed, waterproofing no heat transfer across other surfaces window area 3x 1,5 m high in north wall only. ordinary glass with venetian blinds. lights and occupants : from 07: 00 to 18: 00 average light density: 25 w/m2 number of occupants : 5 seated, light office work room temperature 24°c
Answers: 3
You know the right answer?
Th e results of the spec cpu2006 bzip2 benchmark running on an amd barcelona has an instruction coun...
Questions
question
Biology, 14.09.2020 17:01
question
Mathematics, 14.09.2020 17:01
question
English, 14.09.2020 17:01
question
Mathematics, 14.09.2020 17:01
question
Chemistry, 14.09.2020 17:01
question
Mathematics, 14.09.2020 17:01
question
Physics, 14.09.2020 17:01
question
Mathematics, 14.09.2020 17:01
question
Mathematics, 14.09.2020 17:01
question
Mathematics, 14.09.2020 17:01
question
Mathematics, 14.09.2020 17:01
question
Mathematics, 14.09.2020 17:01
question
English, 14.09.2020 17:01
question
Biology, 14.09.2020 17:01
question
English, 14.09.2020 17:01
question
Mathematics, 14.09.2020 17:01
question
History, 14.09.2020 17:01
question
English, 14.09.2020 17:01
question
Mathematics, 14.09.2020 17:01
Questions on the website: 13722363