Engineering, 14.09.2019 19:10 coolkid20034

Brian is responsible for ordering cement for a construction project. he had just determined that the construction crew would need 540 cubic yards of cement when the building owner decided to shorten the driveway, eliminating the need for 44 cubic yards of cement. how much cement will brian have to order now?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
question
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
You know the right answer?
Brian is responsible for ordering cement for a construction project. he had just determined that the...