An aggregate blend is composed of 53% coarse aggregate by weight
(sp. gr. 2.702), 43% fine aggregate (sp. gr. 2.621), and 4% filler
(sp. gr. 2.779)/ the compacted specimen contains 6% asphalt binder
(sp. gr. 1.052) by weight of total mix, and has a bulk density of
145.2 lb/ft3. ignoring
absorption, computer the percent voids in total mix, percent voids
in mineral aggregate, and the percent voids filled with asphalt.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
question
Engineering, 04.07.2019 18:10
Ahot wire operates at a temperature of 200°c while the air temperature is 20°c. the hot wire element is a tungsten wire of 5 um diameter and 2 mm in length. plot using excel current, heat transfer and heat generated by the wire for air velocity varying from 1-10 m/s in steps of lm/s? matlab the sensor voltage output, resistance, or assume nu 0.989 re033pr13 take air properties at tr (200°c20°c)/2 = 110°c properties of tungsten: c 0.13 kj/kg.k 3 p 19250 kg/m k (thermal conductivity) = 174 w/m.k
Answers: 2
question
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
An aggregate blend is composed of 53% coarse aggregate by weight
(sp. gr. 2.702), 43% fine agg...
Questions
question
Chemistry, 05.05.2021 01:20
question
Mathematics, 05.05.2021 01:20
question
Mathematics, 05.05.2021 01:20
question
Mathematics, 05.05.2021 01:20
question
Mathematics, 05.05.2021 01:20
question
Mathematics, 05.05.2021 01:20
question
Mathematics, 05.05.2021 01:20
Questions on the website: 13722359