subject
Engineering, 13.09.2019 00:30 lauren21bunch

Consider 2 different processors p1, p2 executing the same instruction set.
p1 has a 3.27 ghz clock rate and a cpi of 1.14.
p2 has a 2.74 ghz clock rate and a cpi of 0.94.
if the processors each execute a program in 16 seconds, find the number of cycles for each processor. your answer should be in scientific notation, one non-zero digit to the left of the decimal, enough to the right to make the answer accurate, and multiplied by a power of 10. for example, 1.234 x 10^9.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Describe one experiment in which the glass transition temperature and melting temperature of a totally amorphous thermoplastic material can be determined. show the relevant experimental results in a diagram which should be properly annotated with the two temperatures clearly marked. what is likely to happen to the curve in the diagram if the amorphous polymer is replaced by a thermosetting type?
Answers: 2
question
Engineering, 04.07.2019 19:10
What are the major differences between injection molding and extrusion?
Answers: 2
question
Engineering, 04.07.2019 19:10
The maximum shear stress and maximum flexural stress occur at the same location along a beam subjected to a non-uniform bending load. a)-trune b)- false
Answers: 2
question
Engineering, 04.07.2019 19:10
Agas is compressed from vi 0.3 m, p 1 bar to of v2 0.1 m3, p2--3 bar. pressure and volume are related linearly during the process. for the gas, find the work, in kj.
Answers: 2
You know the right answer?
Consider 2 different processors p1, p2 executing the same instruction set.
p1 has a 3.27 ghz...
Questions
question
Mathematics, 16.07.2019 12:00
Questions on the website: 13722363