subject
Engineering, 03.09.2019 00:30 abdalla46

The company flew an aircraft to mobile alabama for maintenance, repair, and overhaul (mro) service. the aircraft basic weight was 2886 and had a moment calculated at 101673.78. while in the hanger the aircraft was required to be modified. two 15 pound seats located at station +71 were required to be removed. a new cabinet weighing 97 pounds was installed in place of the seats (at station +71). also at station +71, an upgraded seat weighing 20 pounds was installed. as part of the new modification, new radio equipment was installed at station +94 weighing 30 pounds. calculate the new weight of the aircraft and cg of the aircraft after modification:

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
question
Engineering, 04.07.2019 18:20
Determine the damped natural frequencies and the steady state response of a decoupled damped forced two degrees of freedom system. 10ä1 + 2q1 20q1 10 cos t; 10q2 +4q2 + 40q2 10 cos t
Answers: 3
question
Engineering, 04.07.2019 18:20
Apiston-cylinder device contains 0.1 m3 of liquid water and 0.9 m3 of water vapor in equilibrium at 800 kpa. heat is transferred at constant pressure until the temperature of water reaches 350 °c. determine (a) the quality of water at the initial state (b) the work associated with this process, (c) the heat associated with this process.
Answers: 2
question
Engineering, 04.07.2019 18:20
Amixture of slurry and mud is to be pumped through a horizontal pipe of diameter 500 mm. the fluid behaves as a bingham plastic with a yield stress of 30 pa and viscosity 0.04 pa.s. describe the effects of the shear stress through a transverse section of the pipe by plotting the variation in shear stress and velocity profile: (i) just before the slurry starts to move (ii) as the slurry flows when the pressure gradient is double that in part (i)
Answers: 3
You know the right answer?
The company flew an aircraft to mobile alabama for maintenance, repair, and overhaul (mro) service....
Questions
question
Arts, 28.09.2021 23:30
question
Mathematics, 28.09.2021 23:30
Questions on the website: 13722367