subject
Engineering, 06.08.2019 18:10 cgonzalez0243

Ou are serving as an expert witness for the city council of a community. the council is exploring the concept of providing the electrical needs of the community by building a facility with photovoltaic cells to convert sunlight to electric potential energy. but they are facing resistance from members of the community, who claim that there is not enough open land in the community to build such a facility. the opposition is building toward a lawsuit, which the city council wants to avoid. the community requires 2.20 mw of power, and the best photovoltaic cells on the market at the time have an efficiency of 30.0%. in your community, an average intensity of sunlight during the day is 1,110 w/m2. the council members have no idea how much land is needed, so they have asked you to estimate the area of land (in m2) that must be found to construct this facility. (assume the given average intensity of sunlight is only available for eight hours a day.)

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed.gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
Ou are serving as an expert witness for the city council of a community. the council is exploring th...
Questions
question
Mathematics, 21.12.2019 23:31
question
Chemistry, 21.12.2019 23:31
question
Biology, 21.12.2019 23:31
question
Social Studies, 21.12.2019 23:31
question
Mathematics, 21.12.2019 23:31
Questions on the website: 13722360