Engineering, 05.08.2019 19:20 fazegaze89

An ac power generator produces 50 a (rms) at 3600 v. the voltage is stepped up to 100 000 v by an ideal transformer and the energy is transmitted through a long-distance power line which has a resistance of 100 ohms. what percentage of the power delivered by the generator is dissipated as heat in the long-distance power line?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
A-mn has a cubic structure with a0 0.8931 nm and a density of 7.47 g/cm3. b-mn has a different cubic structure, with a0 0.6326 nm and a density of 7.26 g/cm3. the atomic weight of manganese is 54.938 g/mol and the atomic radius is 0.112 nm. determine the percent volume change that would occur if a-mn transforms to b-mn.
Answers: 2
question
Engineering, 04.07.2019 19:10
The short distance from the objective lens to the object causes problems at high magnification. which of the following is the most serious? a. cleaning the object surface b. positioning the object c. reflection from the object surface. d. illumination of the object
Answers: 1
question
Engineering, 04.07.2019 19:10
The air in an automobile tire with a volume of 0.015 m3 is at 32°c and 140 kpa gage. determine the amount of air that must be added to raise the pressure to the recommended value of 206 kpa gage. assume the atmospheric pressure to be 128 kpa and the temperature and the volume to remain constant.[r-0.287 kj/kgk]
Answers: 3
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
An ac power generator produces 50 a (rms) at 3600 v. the voltage is stepped up to 100 000 v by an id...
Questions
question
Biology, 22.05.2020 06:03
Questions on the website: 13722367