subject
Engineering, 26.07.2019 17:10 jrff3262

Acertain manufacturer has signed a contract to ship 500,000 units of its product to her customer within one year. the manufacturer runs a two ten-hour shifts and each shift includes a 30-minutes lunch break and two ten-minutes breaks. the plant works five days a week and have nine holidays per year. calculate the takt time.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Consider a large isothermal enclosure that is maintained at a uniform temperature of 2000 k. calculate the emissive power of the radiation that emerges from a small aperture on the enclosure surface. what is the wavelength ? , below which 10% of the emission is concentrated? what is the wavelength ? 2 above which 10% of the emission is concentrated? determine the wavelength at which maximum spectral emissive power occurs. what is the irradiation incident on a small object placed inside the enclosure?
Answers: 2
question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following ziegler nichols tuning methods the response of the controller to a step input should exhibit an s-shaped curve? a)-open loop mode b)-closed loop mode c)-both modes (open & closed) d)-none of the modes (open & closed)
Answers: 3
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
You know the right answer?
Acertain manufacturer has signed a contract to ship 500,000 units of its product to her customer wit...
Questions
question
Mathematics, 12.12.2020 16:20
question
Mathematics, 12.12.2020 16:20
question
Mathematics, 12.12.2020 16:20
Questions on the website: 13722367