subject
Engineering, 18.07.2019 23:30 carlosthenoob03

The results of cost estimating can be used to serve all of the following objectives, except a)- benchmarking of a firm's productivity improvements b)- evaluating the optimal capital required to make improvements to products (product design) c)- cost estimating doesn't really make sense to engineers. it is the responsibility of accountants. d)- setting selling prices in evaluating engineering contract projects e. none of the above

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 18:10
True or false (explain) (110)[111] is a slip system in bcc metals . the {111} family in fcc contains 8 planes. resolved shear stress (rss) in single crystals is just related to the applied stress. critical resolved shear stress (crss) in single crystal metals is direct proportional to the number of defects in the structure
Answers: 2
question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
You know the right answer?
The results of cost estimating can be used to serve all of the following objectives, except a)- benc...
Questions
question
Mathematics, 29.11.2020 22:00
question
Arts, 29.11.2020 22:00
question
History, 29.11.2020 22:00
question
Mathematics, 29.11.2020 22:00
Questions on the website: 13722363