subject
Engineering, 11.07.2019 03:30 vultuxx

Alawn-mower manufacturing company has signed a contract to deliver 725,600 units of lawn mower to home depot distribution centers in the first 6 months of 2019. the factory works a two 9 hour shifts per day, and does not work on saturdays and sundays. each shift is allowed 35 minutes and a 10 minutes (per shift) allowance for minor machine adjustments. calculate the rate at which the plant must produce each lawn mower to satisfy the retailer's demand.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
question
Engineering, 04.07.2019 18:10
Water at the rate of 1 kg/s is forced through a tube with a 2.5 cm inner diameter. the inlet water temperature is 15°c, and the outlet water temperature is 50°c. the tube wall temperature is 14°c higher than the local water temperature all along the length of the tube. what is the length of the tube?
Answers: 3
question
Engineering, 04.07.2019 18:20
Determine the damped natural frequencies and the steady state response of a decoupled damped forced two degrees of freedom system. 10ä1 + 2q1 20q1 10 cos t; 10q2 +4q2 + 40q2 10 cos t
Answers: 3
You know the right answer?
Alawn-mower manufacturing company has signed a contract to deliver 725,600 units of lawn mower to ho...
Questions
question
Mathematics, 13.07.2019 12:10
Questions on the website: 13722362