Engineering, 06.07.2019 05:10 squawk1738

The ivanpah solar thermal power plant cost $2.2 billion to build. the gross plant electric output is 392 mw, and the net output is 377 mw. the planned capacity factor was 27.4%, but the actual capacity factor in 2016 was 20.5%. at best the plant thermal efficiency appears to be 18%. in addition, for the daily startup process, the solar plant also burned 1.3x10^12 btu of natural gas in 2016. the cost of natural gas in 2016 was about $2.5 per million btu. assuming a levelized annual fixed charge rate of 7%, determine (a) the capital cost (c/kwh) and (b) the fuel cost (e/k wh) for the electricity in 2016.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 18:10
Afull journal bearing has a journal diameter of 27 mm, with a unilateral tolerance of -0.028 mm. the bushing bore has a diameter of 27.028 mm and a unilateral tolerance of 0.04 mm. the l/d ratio is 0.5. the load is 1.3 kn and the journal runs at 1200 rev/min. if the average viscosity is 50 mpa-s, find the minimum film thickness, the power loss, and the side flow for the minimum clearance assembly.
Answers: 1
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
You know the right answer?
The ivanpah solar thermal power plant cost $2.2 billion to build. the gross plant electric output is...
Questions
question
Computers and Technology, 16.09.2019 16:00
question
Mathematics, 16.09.2019 16:00
Questions on the website: 13722367