Engineering, 04.07.2019 18:10 krystabrewer3
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
Engineering, 03.07.2019 23:20
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
Engineering, 04.07.2019 18:10
Shafts are machine elements that are used to a) carry axial loads b) direct shear loads c) transmit power d) rotate at constant speed e) none of the above circular and square shafts subjected to the same torque under the same circum behave a) the same way b) almost the same way
Answers: 2
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
What are the two (02) benefits, which may result from a successful implementation of preventive main...
English, 25.02.2021 01:00
Mathematics, 25.02.2021 01:00
Mathematics, 25.02.2021 01:00
Mathematics, 25.02.2021 01:00
Mathematics, 25.02.2021 01:00
Mathematics, 25.02.2021 01:00
Biology, 25.02.2021 01:00
History, 25.02.2021 01:00
History, 25.02.2021 01:00
English, 25.02.2021 01:00
Mathematics, 25.02.2021 01:00