Based on the following, what is the best description of the relationship between lean manufacturing and sustainable manufacturing? Fairfax Assembly Paint Booth Cleaning

At GM's Fairfax Assembly Plant, paint booths were originally cleaned every other day (after production) to prevent stray drops or chips of old paint from attaching to subsequent paint jobs. It was discovered, however, that the automated section of the painting operations really only needed to be cleaned once a week, as long as the cleaning was thorough, and larger holes were cut in the floor grating to allow for thicker paint accumulations. The reduction in cleaning frequency facilitates improvements in the process "up-time" and flow. As an additional benefit, through this and other more efficient cleaning techniques, use of purge solvent decreased by 3/8 of a gallon per vehicle. When combined with reductions achieved by solvent recycling, VOC emissions from purge solvent reduced by 369 tons in the first year following these adjustments.
The primary goal of lean manufacturing is to reduce pollution.
Environmental concerns typically increase the costs of sustainable manufacturing.
Environmentally friendly solvents are the only way to reduce emissions.
Using fewer chemicals reduces pollution as well as improves efficiencies in manufacturing.

ansver
Answers: 3

Another question on Computers and Technology

question
Computers and Technology, 23.06.2019 00:30
Pl i need the answer now ! which one of the following is considered a peripheral? a software b mouse c usb connector d motherboard
Answers: 1
question
Computers and Technology, 23.06.2019 02:30
These factors limit the ability to attach files to e-mail messages. location of sender recipient's ability to open file size of file type of operating system used
Answers: 2
question
Computers and Technology, 23.06.2019 06:30
You are consulting for a beverage distributor who is interested in determining the benefits it could achieve from implementing new information systems. what will you advise as the first step?
Answers: 1
question
Computers and Technology, 24.06.2019 01:00
The initial tableau of a linear programming problem is given. use the simplex method to solve it. x 1 x 2 x 3 s 1 s 2 z 1 2 4 1 0 0 8 3 4 1 0 1 0 10 minus3 minus12 1 0 0 1 0 the maximum is nothing when x 1equals nothing, x 2equals nothing, x 3equals nothing, s 1equals3, and s 2equals0. (be sure to simplify to lowest terms if necessary.)
Answers: 2
You know the right answer?
Based on the following, what is the best description of the relationship between lean manufacturing...
Questions
question
Mathematics, 27.01.2020 16:31
question
Mathematics, 27.01.2020 16:31
question
Mathematics, 27.01.2020 16:31
Questions on the website: 13722367