subject

[quotes_UsConsolidated_txt. gz]. This file includes US stock quote data. Each row is a quote. A quote could be from a single venue or a consolidated quote across all venues. Each file is 10 minutes for a subset of stocks.
File Specification: The first row from the sample file:
86|1|18:10:00.000|U|0||5|3|BP. N||3=13:09:59.993|1=16|0=39.93|2=0x 52|8=13:09:59.993|6=21|5=39.94|11=2 017-12-11|1715=13:09:59.993|7=0x52| 1427=C|
Each row contains two parts:
The header is comprised of 10 pipe-delimited fields. The only relevant field for this problem is the 9th, the symbol.
Symbols have the form "AAA. BB" where AAA is the ticker and BB is the venue.
Quotes with symbols ending in "." (e. g. "AAA.") are consolidated quotes.
Quotes with venues specified (e. g. "AAA. BB") are venue quotes that contribute to the consolidated quotes for their ticker (e. g. "AAA.").
The body is comprised of a variable number of pipe-delimited key-value fields representing the latest known value for a ticker/venue combination.
If a key is missing, its value is retained from the prior entry for that ticker/venue. Values for a given ticker/venue are valid for a given trade date until explicitly updated.
If a key is specified but has no value (e. g. "|3=|") then the prior value does not carry over, but is instead missing. This may occur if, for example, a venue has no bids for a security at the moment.
The relevant keys are:
0: bid
1: bid size
3: bid time
5: ask
6: ask size
8: ask time
11: trade date
In general, both venue and consolidated quotes are valid until updated. The consolidated quote represents the highest valid bid (or lowest ask) across all venues. Certain condition codes on venue quotes can indicate that the venue is no longer valid for inclusion in the consolidated quote.
Task1: Write ETL code to save the following fields from the venue quotes in Parquet format:
ticker, date, time, venue, bid, bid size, ask, ask size.
The data written should be fully reflective of the state of the market as of each quoteâ€"i. e. if the current bid is unspecified in a row on the input because it is unchanged, it nonetheless should appear in the Parquet data. If the current bid is unavailable because it was explicitly nulled (i. e. a |0=| entry in the file) it should appear as a null in the Parquet data.
Task2: For each date, ticker and minute from 09:31 through 16:00, calculate the number of venues that are showing the same bid price as the consolidated quote at the end of the minute interval. Include only quotes for the trade date specified in the file name.

ansver
Answers: 3

Another question on Computers and Technology

question
Computers and Technology, 22.06.2019 10:30
Auniversity wants to install a client-server network. which feature do you think is important for them as they set up the network? sending email blocking multiple people to use the same file low security low set up cost limited access to files
Answers: 1
question
Computers and Technology, 23.06.2019 12:10
2. fabulously fit offers memberships for$35 per month plus a $50 enrollmentfee. the fitness studio offersmemberships for $40 per month plus a$35 enrollment fee. in how many monthswill the fitness clubs cost the same? what will the cost be?
Answers: 1
question
Computers and Technology, 23.06.2019 17:00
*! 20 points! *jeff wants to create a website with interactive and dynamic content. which programming language will he use? a. dhtml b. html c. css d. javascript
Answers: 1
question
Computers and Technology, 23.06.2019 19:00
Now you’re on your own. include a short summary of this section with plots in your lab report. write a matlab script file to do steps (a) through (d) below. include a listing of the script file with your report. 1 the soundsc(xx,fs) function requires two arguments: the first one (xx) contains the vector of data to be played, the second argument (fs) is the sampling rate for playing the samples. in addition, soundsc(xx,fs) does automatic scaling and then calls sound(xx,fs) to actually play the signal. mcclellan, schafer, and yoder, dsp first, 2e, isbn 0-13-065562-7. prentice hall, upper saddle river, nj 07458. c 2015 pearson education, inc. 4 mcclellan, schafer and yoder, signal processing first. prentice hall, upper saddle river, new jersey, 2003. c 2003 prentice hall. (a) generate a time vector (tt) to cover a range of t that will exhibit approximately two cycles of the 4000 hz sinusoids defined in the next part, part (b). use a definition for tt similar to part 2.2(d). if we use t to denote the period of the sinusoids, define the starting time of the vector tt to be equal to t , and the ending time as ct . then the two cycles will include t d 0. finally, make sure that you have at least 25 samples per period of the sinusoidal wave. in other words, when you use the colon operator to define the time vector, make the increment small enough to generate 25 samples per period. (b) generate two 4000 hz sinusoids with arbitrary amplitude and time-shift. x1.t / d a1 cos.2
Answers: 1
You know the right answer?
[quotes_UsConsolidated_txt. gz]. This file includes US stock quote data. Each row is a quote. A quo...
Questions
question
Mathematics, 26.05.2021 03:00
question
Biology, 26.05.2021 03:00
question
Mathematics, 26.05.2021 03:00
question
Biology, 26.05.2021 03:00
question
Physics, 26.05.2021 03:00
question
Physics, 26.05.2021 03:10
Questions on the website: 13722367