subject

A. IPOS Project 1) Project Description: This project is a large-sized project to develop an Intelligent

Power Optimization System (IPOS).

2) Project attributes of the IPOS project :

(i) Project Size: Large (between 1000 to 4000)

(ii) Project Complexity: Very High

(iii) Requirement Volatility: Very Low

(iv) Degree of Criticalness: High

(v) Time and cost constraint: Low

(vi) existing Project for the domain: Existing

i. Describe the most appropriate software development methodology options to

be chosen by the system analyst, discuss the reasons for choosing these

options

ii. Discuss the set of requirements elicitation techniques selected by the

requirement Analysts, give the reason for selecting each of them.​

ansver
Answers: 3

Another question on Computers and Technology

question
Computers and Technology, 22.06.2019 11:00
Eva has many contacts on the professional networking site she uses which contacts are considered second degree
Answers: 3
question
Computers and Technology, 22.06.2019 17:30
Under which key category do the page up and page down keys fall? page up and page down keys fall under the keys category.
Answers: 1
question
Computers and Technology, 23.06.2019 00:30
Which of the following would you find on a network
Answers: 3
question
Computers and Technology, 23.06.2019 01:00
Let r be a robotic arm with a fixed base and seven links. the last joint of r is a prismatic joint, the other ones are revolute joints. give a set of parameters that determines a placement of r. what is the dimension of the configuration space resulting from your choice of parameters?
Answers: 3
You know the right answer?
A. IPOS Project 1) Project Description: This project is a large-sized project to develop an Intelli...
Questions
question
Mathematics, 22.05.2021 23:20
question
Arts, 22.05.2021 23:20
question
Health, 22.05.2021 23:20
question
Spanish, 22.05.2021 23:20
Questions on the website: 13722367