subject

why does suck like ok I answered this guys question about tech and it deletes my message for no valid reason says its inappropriate when it wasn't like I can do better then this

ansver
Answers: 2

Another question on Computers and Technology

question
Computers and Technology, 23.06.2019 00:30
Knowing that the central portion of link bd has a uniform cross sectional area of 800 mm2 , determine the magnitude of the load p for which the normal stress in link bd is 50 mpa. (hint: link bd is a two-force member.) ans: p = 62.7 kn
Answers: 2
question
Computers and Technology, 23.06.2019 19:00
Now you’re on your own. include a short summary of this section with plots in your lab report. write a matlab script file to do steps (a) through (d) below. include a listing of the script file with your report. 1 the soundsc(xx,fs) function requires two arguments: the first one (xx) contains the vector of data to be played, the second argument (fs) is the sampling rate for playing the samples. in addition, soundsc(xx,fs) does automatic scaling and then calls sound(xx,fs) to actually play the signal. mcclellan, schafer, and yoder, dsp first, 2e, isbn 0-13-065562-7. prentice hall, upper saddle river, nj 07458. c 2015 pearson education, inc. 4 mcclellan, schafer and yoder, signal processing first. prentice hall, upper saddle river, new jersey, 2003. c 2003 prentice hall. (a) generate a time vector (tt) to cover a range of t that will exhibit approximately two cycles of the 4000 hz sinusoids defined in the next part, part (b). use a definition for tt similar to part 2.2(d). if we use t to denote the period of the sinusoids, define the starting time of the vector tt to be equal to t , and the ending time as ct . then the two cycles will include t d 0. finally, make sure that you have at least 25 samples per period of the sinusoidal wave. in other words, when you use the colon operator to define the time vector, make the increment small enough to generate 25 samples per period. (b) generate two 4000 hz sinusoids with arbitrary amplitude and time-shift. x1.t / d a1 cos.2
Answers: 1
question
Computers and Technology, 23.06.2019 19:30
What are loans to a company or government for a set amount of time
Answers: 1
question
Computers and Technology, 23.06.2019 20:10
Leo is a recruitment executive for a large company. he has identified new labor resource requirements in both the marketing and production departments. what should be his first step in recruiting candidates for the positions? a. conduct background checks of candidates b. make job offers c. arrange interviews d. conduct reference checks e. place job ads on job sites
Answers: 1
You know the right answer?
why does suck like ok I answered this guys question about tech and it deletes my message for no vali...
Questions
question
Mathematics, 06.10.2019 06:10
question
Mathematics, 06.10.2019 06:10
Questions on the website: 13722361