subject

Given a structural design calling for 1-inch rebar with 2 inches of cover and a spacing of 2 inches center-to-center in a 9-inch thick wall section and the concrete is to be pumped through a 3-inch pipe, what is the nominal maximum aggregate size allowed by the ACI 318-08 code?

ansver
Answers: 1

Another question on Computers and Technology

question
Computers and Technology, 23.06.2019 17:30
What are the most commonly found items in the trash according to the municipal solid waste report?
Answers: 1
question
Computers and Technology, 24.06.2019 06:50
What are the things you are considering before uploading photos on social media?
Answers: 1
question
Computers and Technology, 24.06.2019 16:30
Pressing the backspace key deletes the text to the of the insertion point. the left or the right?
Answers: 1
question
Computers and Technology, 25.06.2019 00:10
Select the correct answer sarah wants to use a device to input signatures on electronic documents. which input device will be most suitable for her? a digital pen b. laser pen c keyboard d. touchscreen reset next
Answers: 2
You know the right answer?
Given a structural design calling for 1-inch rebar with 2 inches of cover and a spacing of 2 inches...
Questions
question
Geography, 16.09.2019 14:30
question
Social Studies, 16.09.2019 14:30
Questions on the website: 13722365