You are helping plan a new stretch of highway that is M miles long. One issue that came up is the placements of gas-stations. We will assume that someone has built a gas station at the beginning (0 mile away) and at the end (M miles away) of the highway stretch. It is required that two consecutive stations (including the ones at the beginning and at the end) must be at least m0 miles apart, and at most m1 miles apart where m1 ≥ m0. You also have estimates on costs of building gas-stations at various points along the highway. The costs vary due to differences in the land around the highway, and the proximity of town. The possible options (measured from the start of the highway) are at miles x1, . . . , xn, and location xi has cost estimate ci > 0. You may assume that for the inputs you are given, there is always a feasible solution. Design a O(n log n) dynamic programming algorithm for finding a set of gas stations of minimum cost satisfying the requirements, and implement the algorithm in Java. We suggest using subproblem Opt[i] to be the minimum cost solution for the stretch of highway up to position xi with a gas-station at location xi .

ansver
Answers: 1

Another question on Computers and Technology

question
Computers and Technology, 22.06.2019 05:00
Write a loop that reads positive integers from standard input and that terminates when it reads an integer that is not positive. after the loop terminates, it prints out, on a line by itself and separated by spaces, the sum of all the even integers read, the sum of all the odd integers read, a count of the number of even integers read, and a count of the number of odd integers read, all separated by at least one space. declare any variables that are needed. assume the availability of a variable, stdin, that references a scanner object associated with standard input. that is, stdin = new scanner(system.in); is given.
Answers: 3
question
Computers and Technology, 22.06.2019 22:30
The qwerty keyboard is the most common layout of keys on a keyboard
Answers: 3
question
Computers and Technology, 24.06.2019 02:30
Which option completes the explanation for conflict of interest in an organization
Answers: 1
question
Computers and Technology, 24.06.2019 04:30
What is the process in which the software development team compiles information to determine the final product
Answers: 1
You know the right answer?
You are helping plan a new stretch of highway that is M miles long. One issue that came up is the pl...
Questions
question
History, 06.05.2020 17:07
question
Mathematics, 06.05.2020 17:07
question
Mathematics, 06.05.2020 17:07
question
History, 06.05.2020 17:07
Questions on the website: 13722367