subject

A Cisco Catalyst switch has 24 10/100 ports, numbered 0/1 through 0/24. Ten PCs connect to the ten lowest numbered port, with those PCs working and sending data over the network. The other ports are not connected to any device. Which of the following answers lists facts displayed by the show interfaces status command?a. Port Ethernet 0/1 is in a connected state.
b. Port Fast Ethernet 0/11 is in a connected state.
c. Port Fast Ethernet 0/5 is in a connected state.
d. Port Ethernet 0/15 is in a notconnected state.

ansver
Answers: 1

Another question on Computers and Technology

question
Computers and Technology, 21.06.2019 21:30
Felicia wants to become a head surgeon by december 2013. she designs the career milestones that she would need to complete her goal. by june 2013, she was not licensed. which best describes what she should do?
Answers: 2
question
Computers and Technology, 23.06.2019 13:10
What is domain name system (dns)? allows dynamic ip address allocation so users do not have to have a preconfigured ip address to use the network converts ip addresses into domains, or identifying labels that use a variety of recognizable naming conventions the efficient coexistence of telephone, video, and data communication within a single network, offering convenience and flexibility not possible with separate infrastructures the integration of communication channels into a single service
Answers: 2
question
Computers and Technology, 24.06.2019 00:30
Use the keyword strategy to remember the meaning of the following word. the meaning for the word has been provided. write your keyword and describe the picture you would create in your mind. obfuscate: to make something so confusing that it is difficult to understand.
Answers: 2
question
Computers and Technology, 24.06.2019 03:30
What is the purpose of a computer network needs assessment? to analyze which workers need more training to improve their performance to compare worker productivity to determine what steps employees can take to increase company revenue to evaluate how to move from the current status to the desired goal
Answers: 2
You know the right answer?
A Cisco Catalyst switch has 24 10/100 ports, numbered 0/1 through 0/24. Ten PCs connect to the ten l...
Questions
question
Mathematics, 28.09.2019 23:30
question
Biology, 28.09.2019 23:30
question
Spanish, 28.09.2019 23:30
Questions on the website: 13722363