subject

Create a cell array, called a, with the following contents: a. make a copy of a called b. (nothing complicated: b = a is sufficient.) in b, change the ‘t’ in ‘matlab’ to ‘t’ by accessing that element of the cell array. b. make a character array c that contains ‘simulink’, by extracting it from the cell array. c. add a 3rd row to the matrix in b{2,1} with the numbers 4,7. (after this step, b{2,1} should be [3, 9; 8, 2; 4, 7].

ansver
Answers: 1

Another question on Computers and Technology

question
Computers and Technology, 22.06.2019 04:40
Amain idea is supported, explained, or expanded on with a numbers b. a concluding statement c. details d. a topic sentence. im e paragraphs reset nex next
Answers: 2
question
Computers and Technology, 22.06.2019 06:40
Match the personality traits with their description
Answers: 2
question
Computers and Technology, 22.06.2019 10:30
This first part of the film shows the early history of motion pictures. how accurate do you think the portrayal of the early motion picture industry is? why? is historical accuracy important in films and theatre productions? explain. in the scene where don is going to the party (starting at time code 14: 51), we see a street scene as he first rides with cosmo and then with kathy. what aspects did the filmmaker include to make the scene look and feel like don, cosmo, and kathy are riding in a car on a street? think about elements such as scenery, sound, props, lighting, and so on. a "talkie" picture is shown starting around time code 21: 15. how does the audience in the film react to the "talkie"? what influence do audiences have on film and theatre performances? how do film and theatre actors influence audiences? in the musical scene with cosmo (starting at time code 27: 00), how does the actor use props? what is the result? do you think the use of props effectively fulfilled the artistic vision for this musical number? why or why not?
Answers: 1
question
Computers and Technology, 23.06.2019 01:40
Writing a modular program in visual c++. i am new to this and not sure what i am missing. i am getting the following error: baddate.cpp: in function ‘int main()’: baddate.cpp: 50: 3: error: ‘else’ without a previous ‘if’elsehere are the instructions and code: writing a modular program in c++in this lab, you add the input and output statements to a partially completed c++ program. when completed, the user should be able to enter a year, a month, and a day. the program then determines if the date is valid. valid years are those that are greater than 0, valid months include the values 1 through 12, and valid days include the values 1 through 31.notice that variables have been declared for you.write the simulated housekeeping() function that contains the prompts and input statements to retrieve a year, a month, and a day from the user.include the output statements in the simulated endofjob() function. the format of the output is as follows: month/day/year is a valid date.ormonth/day/year is an invalid date.execute the program entering the following date: month = 5, day = 32, year = 2014. record the output of this program.execute the program entering the following date: month = 9, day = 21, year = 2002. record the output of this /* program name: baddate.cppfunction: this program determines if a date entered by the user is valid.input: interactiveoutput: valid date is printed or user is alerted that an invalid date was entered*/#include bool validatedate(int, int, int); using namespace std; int main(){// declare variablesint year; int month; int day; const int min_year = 0, min_month = 1, max_month = 12, min_day = 1, max_day = 31; bool validdate = true; // this is the work of the housekeeping() method// get the year, then the month, then the daycout< < "enter the year"< > year; cout< < "enter the month"< > month; cout< < "enter the day"< > day; // this is the work of the detailloop() method// check to be sure date is validif(year < = min_year) // invalid yearvaliddate = false; else if (month < min_month || month > max_month) // invalid monthvaliddate = false; else if (day < min_day || day > max_day) // invalid dayvaliddate = false; // this is the work of the endofjob() method// test to see if date is valid and output date and whether it is valid or notif(validdate == true); {// output statementcout<
Answers: 1
You know the right answer?
Create a cell array, called a, with the following contents: a. make a copy of a called b. (nothing...
Questions
question
Chemistry, 17.04.2021 01:00
Questions on the website: 13722361