A pharmaceutical company wants to test the efficiency of its new drug production techniques so they run 3 shifts of production for 4 hours each and collect the product at the end of each shift. Their chemical engineers predict a maximum of 7000 grams of product can be created each shift. Shift one produces 4562 grams.
Shift two produces 5783 grams.
Shift three produces 5247 grams.

What is the average percent yield for this new production technique?
A. 74.25%
B. 82.61%
C. 74.95%
D. 51.97%

ansver
Answers: 1

Another question on Chemistry

question
Chemistry, 22.06.2019 11:00
What is the molar mass of a gas that has density of 2.054 g/l
Answers: 2
question
Chemistry, 22.06.2019 14:10
16. in a reaction that has reached equilibrium, a. the forward and reverse reactions are occurring at the same rate. b. the reactants and products are in equal concentrations. c. the forward reaction has gone further than the reverse reaction. d. there are equal numbers of atoms on both sides of the equation. e. a, b, and d are correct.
Answers: 2
question
Chemistry, 22.06.2019 15:00
What energy is it when you flip on a switch on a lamp
Answers: 1
question
Chemistry, 22.06.2019 22:40
Covalent bonds generally form when the bonded elements have a difference in electronegativity less than 1.5. subtract the electronegativities for the following pairs of elements and predict whether they form a covalent bond. electronegativity difference of c and c: ionic covalent electronegativity difference of mg and cl: ionic covalent
Answers: 1
You know the right answer?
A pharmaceutical company wants to test the efficiency of its new drug production techniques so they...
Questions
question
Mathematics, 15.12.2019 02:31
Questions on the website: 13722367