subject
Chemistry, 25.09.2020 22:01 droid5004

An engineer in team has a goal of developing a bicycle frame that is built lighter and stronger than previous models. Which cost benefit analysis has left a potential risk? A. Better function compared to ecological damage of mining material and research and development time.
B. Increase sales compared to employee stress and loss of natural resources
C. Increase sales compared to research and development time and cost of materials.
D. Better function compare to uncertain supply of materials and research and development time.

ansver
Answers: 3

Another question on Chemistry

question
Chemistry, 22.06.2019 05:30
The climate of the continental united states is generally 1. tropical 2. temperate 3. arctic 4. highland
Answers: 1
question
Chemistry, 22.06.2019 14:00
How does the viscosity of magma change as magma cools?
Answers: 2
question
Chemistry, 22.06.2019 15:30
Light waves travel than sound waves.
Answers: 2
question
Chemistry, 22.06.2019 18:30
The table lists the lattice energies of some compounds.compoundlattice energy (kj/mol)lif            –1,036licl            –853naf            –923kf            –821nacl            –786which statement about crystal lattice energy is  best  supported by the information in the table? the lattice energy increases as cations get smaller, as shown by lif and kf.the lattice energy increases as the cations get larger, as shown by lif and licl.the lattice energy decreases as cations get smaller, as shown by nacl and naf.the lattice energy decreases as the cations get smaller, as shown by naf and kf.
Answers: 3
You know the right answer?
An engineer in team has a goal of developing a bicycle frame that is built lighter and stronger than...
Questions
question
Mathematics, 02.08.2019 11:00
Questions on the website: 13722363